Call 08047631908 81% Response Rate

Send Email

Electrostatic Precipitator Maintenance Service

Prominent & Leading Manufacturer from Coimbatore, we offer electrostatic precipitator maintenance service.
Electrostatic Precipitator Maintenance Service
  • Electrostatic Precipitator Maintenance Service
  • Electrostatic Precipitator Maintenance Service
  • Electrostatic Precipitator Maintenance Service
  • Electrostatic Precipitator Maintenance Service
  • Electrostatic Precipitator Maintenance Service

Electrostatic Precipitator Maintenance Service

Product Price: Rs 5 Lakh / PieceGet Best Price

Product Brochure

Product Details:
Type of electrostatic precipitatorDry ESP
OrientationHorizontal
Power Capacity5 MW to 600 MW
Gas Temperature (in Celcius)Upto 350 Deg C
Gas Flow Rate5 m3/sec to 1200 m3/sec
Warranty1 Year
UsageCement, Steel, Thermal Power, Sponge Iron, Sugar, Paper plants, etc,.
TypeDry Horizontal Flow
MaterialMild Steel
Automation GradeFully Automatic
Country of OriginMade in India

We are offering of Electrostatic Precipitator Maintenance Service to our clients. Unicon is fully equipped with spares and highly Skilled and experienced service department. Unicon assures fastest delivery and an immediate attention to our customer calls for any service requirement.

Why Unicon?

  • Performance of Unicon Retrofits are very good
  • The cost advantage to the customer
  • Expertise to complete any critical job within the available shutdown time
  • Rich experience in Shut down maintenance services of all brands of ESP
  • Complete solution to the customer

We can offer our services with ESP’s, Bag Houses, Pneumatic Conveying systems, Wet scrubbers etc., for Thermal, Captive, Bagasse based power units, Steel industries, Sugar Factories, Paper Industries, Cement industries, etc,.

  • Please find below details of some critical retrofits we executed.
  • Revamping of 300 MW ESP of in a short span including supply of Collecting Electrodes, Emitting Electrodes and other internals.
  • Design, Engineering, Manufacturing, Supply, Erection and Commissioning of damaged ESP of Electrostatic Precipitator of 110 MW Thermal Power Plant.
  • Critical project of Replacement of existing ESP with a New ESP with increased collecting area for Rotary kiln of Paper Plant. The existing ESP and New to be installed is at third floor of a building. We have successfully completed Dismantling of existing ESP, Erection and Commissioning new ESP within 18 days against 20 days as per the order.
  • Retrofitting of 67.5 MW ESP including filling of the dummy fields (retrofitting of 16 fields + filling of 2 dummy fields).
  • Retrofitting of Sinter Plant ESP: The scope of Supply involved are supply of Collecting Electrodes, Emitting Electrodes & Other Spares. Scope of services involved are replacement of internals of 6 fields and overhauling of balance 2 fields. UNICON successfully completed the same in 12 days shutdown.

 

Get Best QuoteRequest A Callback

EXPLORE MORE CATEGORIES

Contact Us
 
Thank youYour Enquiry has been sent successfully.
© Unicon Engineers. All Rights Reserved (Terms of Use)Developed and managed by IndiaMART InterMESH Ltd.